West River House

424 W End Ave

This Property At A Glance

In Upper West Side

424 W End Ave is located in Upper West Side, a neighborhood in Manhattan.

Wealthy Area

The median income in this area is $122,552, which is higher than typical for Manhattan.

Tree-Lined Streets

There are 121 street trees within a block of 424 W End Ave.

West River House is a 22-floor, 231-unit building in Manhattan's Upper West Side near West 81st Street and West End Avenue.

If you live at or are thinking of moving to West River House, you'll want to carefully examine the 11 problems and violations we've detected in this property's records. In addition, residents filed 39 noise complaints, 4 filth complaints, and 4 street quality complaints.

Building records show 26 construction or renovation projects at West River House since 2003. As for neighborhood change, records show 0 demolitions and 0 new building developments in the area within the past year.

The closest subway access includes the 1 and 2 at Broadway & 79th St, there are 0 Citi Bike stations nearby, and the typical wait time for a taxi at West River House is 3 minutes.

As for the demographics around West River House, the median age is 38, 54% of residents are married, and 22% of residents have at least one child. The median individual full-time income is about $122,552 and about 35% of adults here have a bachelor's degree or higher. Registered voters in this building are 70% Democrat.

This address is zoned for New York City Public Schools, which is rated below average overall. You can see individual ratings and program information on nearby schools like New Explorations Into Science, Tech And Math High School, School Of The Future High School, and Manhattan Bridges High School in the report below.

Regarding weather, the average summer temperature is 76.5°F, while the average winter temperature is 32.1°F.

Building

Unit Count
231
Floor Count
22

Elevators

Heading up during evening peak
Typical Lobby Wait Time
12
seconds
Travel Time From Lobby
52
seconds
Heading down during morning peak
Typical Floor Wait Time
25
seconds
Travel Time From Floor
46
seconds

Complaints and Violations

Violations data comes from NYC HPD (Housing Preservation and Development) and is collected via NYC 311.
The total number of problems reported for is
9
Problems
Date Unit Space Problem Priority Status
December 28, 2017 12J ENTIRE APT APARTMENTONLY: NO HEAT Emergency Resolved
October 26, 2017 6J BUILDING-WIDE ENTIREBUILDING: NO HOT WATER Emergency Resolved
October 24, 2017 3D PUBLIC HALL SPRINKLER: SYSTEM BRKN Immediate Emergency Resolved
October 18, 2017 6J BUILDING-WIDE ENTIREBUILDING: NO HOT WATER Emergency Resolved
November 07, 2016 13D ENTIRE APT ENTIREBUILDING: NO HOT WATER Emergency Resolved
February 16, 2016 2J ENTIRE APT ENTIREBUILDING: NO HEAT Emergency Resolved
May 25, 2013 21D ENTIRE APT HEAT: NO HEAT Emergency Resolved
April 29, 2013 21C ENTIRE APT HEAT: NO HEAT Emergency Resolved
March 06, 2013 14J ENTIRE BUILDING HEAT: NO HEAT Emergency Resolved
The total number of historical violations for is
2
Violations
Date Observed Violation Priority Status
June 21, 2012 Mold Hazards Non Hazardous Closed
§ 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT THE NORTH WALL IN THE BATHROOM FROM NORTH AT WEST LOCATED AT APT 3C, 3rd STORY, 3rd APARTMENT FROM WEST AT NORTH
June 20, 2012 Mold Hazards Non Hazardous Closed
§ 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT GROUTS AROUND CERAMIC TILES AT SOUTH & WEST WALLS ,APPROX. 10 SQUARE FEET IN THE BATHROOM FROM EAST AT SOUTH LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST

Financial

Transportation

Subway Access

Broadway & 79th St
1
2
2 min

Taxi Stats

The typical wait time for a taxi is
3
minutes at West 81st Street and West End Avenue
In a typical hour
48
available taxis pass by West 81st Street and West End Avenue
In a typical hour
5
taxis pick up passengers at West 81st Street and West End Avenue
In a typical hour
5
taxis drop off passengers at West 81st Street and West End Avenue

Commute Stats

The common time to leave for work in this neighborhood is
8:30 AM to 8:59 AM
The most common way to commute in this neighborhood is
Subway
There are
0
Citi Bike Stations within 3 blocks of
The percent of households with at least one car in this area is
24%

Your Commute Times

New Businesses

EATING - DRINKING
PERSONAL SERVICES
PET SERVICES
SHOPPING
There are
3
NEW
EATING - DRINKING
ESTABLISHMENTs
There is
1
NEW
PERSONAL SERVICES
ESTABLISHMENT
There are
2
NEW
PET SERVICES
ESTABLISHMENTs
There are
5
NEW
SHOPPING
ESTABLISHMENTs

Local Quality

Local Quality at a Glance

Incident data comes from NYC 311. To report complaints or learn more about NYC 311 visit here
There were
39
noise complaints in the last year within a block
Loud Music / Party
Construction
Loud Talking / Yelling
Car / Truck
Dog Barking
Industrial / Machinery
Alarm
Other
Helicopter

(Map will refresh as you pan. Locations are approximate.)

There were
4
filth complaints in the last year within a block
Sewer
Graffiti
Air Quality
Urinating in Public
Hazardous Materials
Street Filth
Litter / Clutter
Industrial Waste

(Map will refresh as you pan. Locations are approximate.)

There were
4
street complaints in the last year within a block
Street Light
Road Condition
Scaffold Safety
Dead Tree
Sidewalk Condition
Broken Parking Meter

(Map will refresh as you pan. Locations are approximate.)

Rodent Sightings

8 rodent sightings reported within a block of

18 rodent sightings is typical around buildings in Manhattan

Condition Attracting Rodents
Rat Sighting
Mouse Sighting
Signs of Rodents
Rodent Bite

(Map will refresh as you pan. Locations are approximate.)

Street Trees

121 street trees within a block of

77 street trees is typical around buildings in Manhattan

School

School District

This property is zoned for
NEW YORK CITY PUBLIC SCHOOLS
This school district has
1,880
schools
There are
1,038,001
students enrolled in this district

Elementary School Near

NEW EXPLORATIONS INTO SCIENCE, TECH AND MATH HIGH SCHOOL
4.6 mile away

Middle Schools Near

PROFESSIONAL PERFORMING ARTS HIGH SCHOOL
1.7 mile away
CENTRAL PARK EAST HIGH SCHOOL
1.7 mile away
THURGOOD MARSHALL ACADEMY FOR LEARNING AND SOCIAL
2.8 mile away
SCHOOL OF THE FUTURE HIGH SCHOOL
3.2 mile away

High Schools Near

INDEPENDENCE HIGH SCHOOL
1.3 mile away
HIGH SCHOOL FOR ENVIRONMENTAL STUDIES
1.3 mile away
LANDMARK HIGH SCHOOL
1.3 mile away
MANHATTAN BRIDGES HIGH SCHOOL
1.5 mile away

Construction

There have been
26
construction projects in this building since 2003
Date Type
December 17, 2016 Sidewalk Shed Installation
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. WORK SHALL COMPLY WITH 2014 BUILDING CODE CHAPTER 33. NO CHANGE IN USE EGRESS OR OCCUPANCY.
September 03, 2014 Alteration
FILING HEREWITH A FIRE PROTECTION PLAN AS REQUIRED BY DIRECTIVE NO. 1 OF 1981. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
July 03, 2013 Plumbing Work
ACTIVATE GAS PORTION OF (2) EXISTING GAS BURNERS ON (2) EXISTING LOW PRESSURE BOILERS. DISCONTINUE USE OF OIL. ABANDON EXISTING FUEL STORAGE TANK. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
May 31, 2013 Other Work
March 29, 2013 Plumbing Work
INSTALLATIOM OF NEW PEREMITER AIR CONDITIONING UNITS AND NEW PANTRY IN THE MULTI PURPOSE ROOM AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGREE OR OCCUPANCY.
March 08, 2013 Plumbing Work
INSTALLATION OF NEW PERIMETER AIR CONDTIONING UNITS AS PER PLAN FILEDHEREWITH IN CONJUNTION WITH WORK BEING DONE WITH ALT.#120649174. NO CHANGE IN USE, EGRESS OR OCCUPANCY
March 08, 2013 Plumbing Work
INSTALLATIOM OF NEW PEREMITER AIR CONDITIONING UNITS AND NEW PANTRY IN THE MULTI PURPOSE ROOM AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGREE OR OCCUPANCY.
March 08, 2013 Plumbing Work
INSTALLATIOM OF NEW PEREMITER AIR CONDITIONING UNITS AND NEW PANTRY IN THE MULTI PURPOSE ROOM AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGREE OR OCCUPANCY.
March 08, 2013 Plumbing Work
INSTALLATIOM OF NEW PEREMITER AIR CONDITIONING UNITS AND NEW PANTRY IN THE MULTI PURPOSE ROOM AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGREE OR OCCUPANCY.
March 07, 2013 Plumbing Work
FILING HEREWITH MECANICAL & PLUMBING DRAWINGS IN CONJUNCTION WITH FOR THE ALT. 1 #120649174
March 07, 2013 Plumbing Work
INSTALLATION OF NEW PERIMETER AIR CONDTIONING UNITS AS PER PLAN FILEDHEREWITH IN CONJUNTION WITH WORK BEING DONE WITH ALT.#120649174. NO CHANGE IN USE, EGRESS OR OCCUPANCY
March 07, 2013 Plumbing Work
INSTALLATION OF NEW PERIMETER AIR CONDTIONING UNITS AS PER PLAN FILEDHEREWITH IN CONJUNTION WITH WORK BEING DONE WITH ALT.#120649174. NO CHANGE IN USE, EGRESS OR OCCUPANCY
March 07, 2013 Plumbing Work
INSTALLATION OF NEW PERIMETER AIR CONDTIONING UNITS AS PER PLAN FILEDHEREWITH IN CONJUNTION WITH WORK BEING DONE WITH ALT.#120649174. NO CHANGE IN USE, EGRESS OR OCCUPANCY
March 05, 2013 Plumbing Work
FILING HEREWITH MECANICAL & PLUMBING DRAWINGS IN CONJUNCTION WITH FOR THE ALT. 1 #120649174
February 23, 2013 Plumbing Work
NEW PLUMBING FIXTURES BEING PROVIDED FOR EXISTING PENTHOUSE HEALTH CLUB
February 20, 2013 Alteration
FILED HEREWITH EXTERIOR FACADE REPAIR INCLUDING BRICK REPLACEMENT AND CONCRETE BALCONY REPAIR TO ABATE ECB VIOLATION#34872580P. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
January 31, 2012 Sidewalk Shed Installation
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33
August 02, 2011 Major Alteration
RENOVATION OF EXISTING PENTHOUSE HEATH CLUB AND CHANGE TO THE APARTMENT COUNT ON THE 21ST FLOOR
June 07, 2011 Alteration
ERECTION OF NEW PARTITIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
April 14, 2010 Alteration
PROPOSED REPAIRS TO PARKING GARAGE AS INDICATED ON PLANS AN APPLICATIONS. THERE IS NO CHANGE IN USE EGRESS OR OCCUPANCY.
December 28, 2007 Mechanical/HVAC Work
AIR CONDITIONING INSTALLATION. THERE WILL BE NO CHANGE IN USE EGRESS OR OCCUPANCY.
December 01, 2006 Alteration
RENOVATION OF EXISTING LOBBYNO CHANGE IN USE EGRESS OR OCCUP ANCY
October 03, 2006 Alteration
EXTERIOR REPAIRS. NO CHANGE TO EGRESS OROCCUPANCY,USE. SIDEWALK SHED FILED UNDER A APPLICATION 104521661.
August 18, 2006 Sidewalk Shed Installation
INSTALL HEAVY DUTY SIDEWALK SHED FOR A TOTAL OF 320 FT LONG AT WEST END AVENUE.150 FT LONG ON W. 81 ST STREET AND 170 FT LONG ON WEST END AVENUE. DURING REMEDIAL REPAIRS. WORK TO COMPLY WITH LL33/91. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
November 04, 2005 Mechanical/HVAC Work
Installation of roof top air-conditioning equipment. No change to egress, use, or occupancy.
June 05, 2003 Fire Alarm Work
Remove Manual Fire Alarm System. Install New Addressable Smoke Detectors and Water Flow Devices.
There have been
0
scaffolds installed in the last 90 days within 3 blocks
Scaffold
Sidewalk Shed

(Map will refresh as you pan. Locations are approximate.)

There have been
0
demolitions in the last year within 5 blocks
There have been
0
new buildings in the last year within 5 blocks

Crime

Crime Risks (This data represents crime risk for the ZIP code of the property.)

Risk of burglary
in this area is
22%
lower than the national average
Risk of assault
in this area is
27%
higher than the national average
Risk of robbery
in this area is
78%
higher than the national average
Risk of rape
in this area is
3%
lower than the national average
Risk of murder
in this area is
17%
higher than the national average
Risk of car theft
in this area is
5%
higher than the national average

Demographics

Census at a Glance

The median age is
39
Years Old
The most common education level in this area is
Bachelor's Degree
Households with children are
22%
of all households in this area
The percent of people in this area who are married is
54%

Political

This Building is
69%
registered Democrat
The Area is
70%
registered Democrat

Weather & Natural Disasters