8700 25th Ave

This Property At A Glance

In Bensonhurst

8700 25th Ave is located in Bensonhurst, a neighborhood in Other.

Tree-Lined Streets

There are 312 street trees within a block of 8700 25th Ave.

8700 25th Ave is a 6-floor, 123-unit building in Brooklyn's Bensonhurst.

If you live at or are thinking of moving to 8700 25th Ave, you'll want to carefully examine the 129 problems and violations we've detected in this property's records. In addition, residents filed 0 noise complaints, 5 filth complaints, and 2 street quality complaints.

Building records show 3 construction or renovation projects at 8700 25th Ave since 2003. As for neighborhood change, records show 0 demolitions and 0 new building developments in the area within the past year.

There are 0 Citi Bike stations nearby and the typical wait time for a taxi at 8700 25th Ave is 20 minutes.

As for the demographics around 8700 25th Ave, the median age is 42, 62% of residents are married, and 28% of residents have at least one child. The median individual full-time income is about $48,482 and about 13% of adults here have a bachelor's degree or higher. Registered voters in this building are 78% Democrat.

This address is zoned for New York City Public Schools, which is rated below average overall. You can see individual ratings and program information on nearby schools like P.s. 101 The Verrazano, Is 281 Joseph B Cavallaro, and Life Academy High School For Film And Music in the report below.

Regarding weather, the average summer temperature is 77.1°F, while the average winter temperature is 33.1°F. The average annual rainfall is 46.6 inches and the average annual snowfall is 22.7 inches.

Building

Unit Count
123
Floor Count
6

Elevators

Heading up during evening peak
Typical Lobby Wait Time
11
seconds
Travel Time From Lobby
34
seconds
Heading down during morning peak
Typical Floor Wait Time
16
seconds
Travel Time From Floor
31
seconds

Complaints and Violations

Violations data comes from NYC HPD (Housing Preservation and Development) and is collected via NYC 311.
The total number of problems reported for is
101
Problems
Date Unit Space Problem Priority Status
July 06, 2019 2K ENTIRE APT PESTS: MICE Non-Emergency Resolved
May 11, 2019 7F ELEVATOR MAINTENANCE: DIRTY/UNSANITRY Non-Emergency Resolved
May 07, 2019 7F ENTIRE APT GAS: SHUT- OFF Emergency Resolved
April 19, 2019 7A KITCHEN REFRIGERATOR: BROKE DOOR SEAL Non-Emergency Resolved
March 20, 2019 4N BUILDING-WIDE GAS: SHUT- OFF Emergency Resolved
March 02, 2019 2U ENTIRE APT ENTIREBUILDING: NO HEAT Emergency Resolved
February 24, 2019 3C ENTIRE APT ENTIREBUILDING: NO HEAT Emergency Resolved
February 14, 2019 6K ENTIRE APT GAS: SHUT- OFF Emergency Resolved
February 07, 2019 7A KITCHEN ELEC/GAS-RANGE: NO GAS/ELECTRIC Non-Emergency Resolved
February 07, 2019 BLDG BUILDING-WIDE GAS: SHUT- OFF Emergency Resolved
February 02, 2019 BLDG BUILDING-WIDE GAS: SHUT- OFF Emergency Resolved
January 30, 2019 2E ENTIRE APT APARTMENTONLY: NO HEAT Emergency Resolved
January 28, 2019 6V ENTIRE APT GAS: SHUT- OFF Emergency Resolved
January 27, 2019 BLDG BUILDING-WIDE GAS: SHUT- OFF Emergency Resolved
January 21, 2019 2E ENTIRE APT APARTMENTONLY: NO HEAT Emergency Resolved
January 21, 2019 BLDG BUILDING-WIDE GAS: SHUT- OFF Emergency Resolved
January 21, 2019 BLDG BUILDING-WIDE ENTIREBUILDING: NO HEAT Emergency Resolved
January 21, 2019 BLDG BUILDING-WIDE ENTIREBUILDING: NO HEAT Emergency Resolved
January 21, 2019 BLDG BUILDING-WIDE ENTIREBUILDING: NO HEAT Emergency Resolved
January 21, 2019 BLDG BUILDING-WIDE GAS: SHUT- OFF Emergency Resolved
January 21, 2019 2E ENTIRE APT APARTMENTONLY: NO HEAT Emergency Resolved
January 21, 2019 4F BUILDING-WIDE GAS: SHUT- OFF Emergency Resolved
January 21, 2019 4F BUILDING-WIDE ENTIREBUILDING: NO HEAT/HOT WTR Emergency Resolved
January 21, 2019 BLDG BUILDING-WIDE GAS: SHUT- OFF Emergency Resolved
January 20, 2019 BLDG BUILDING-WIDE ENTIREBUILDING: NO HEAT Emergency Resolved
January 20, 2019 BLDG BUILDING-WIDE GAS: SHUT- OFF Emergency Resolved
January 19, 2019 7A ENTIRE APT APARTMENTONLY: NO HEAT Emergency Resolved
January 19, 2019 7A ENTIRE APT GAS: SHUT- OFF Emergency Resolved
January 19, 2019 BLDG BUILDING-WIDE GAS: SHUT- OFF Emergency Resolved
January 19, 2019 6O ENTIRE APT ENTIREBUILDING: NO HEAT Emergency Resolved
January 19, 2019 6O ENTIRE APT GAS: SHUT- OFF Emergency Resolved
January 18, 2019 2E ENTIRE APT GAS: SHUT- OFF Emergency Resolved
January 17, 2019 2C ENTIRE APT APARTMENTONLY: NO HEAT Emergency Resolved
January 15, 2019 BLDG BUILDING-WIDE GAS: SHUT- OFF Emergency Resolved
January 15, 2019 BLDG BUILDING-WIDE GAS: SHUT- OFF Emergency Resolved
January 15, 2019 BLDG BUILDING-WIDE GAS: SHUT- OFF Emergency Resolved
January 13, 2019 BLDG BUILDING-WIDE ENTIREBUILDING: NO HEAT/HOT WTR Emergency Resolved
January 13, 2019 BLDG BUILDING-WIDE GAS: SHUT- OFF Emergency Resolved
January 13, 2019 BLDG BUILDING-WIDE ENTIREBUILDING: NO HEAT/HOT WTR Emergency Resolved
January 13, 2019 BLDG BUILDING-WIDE ENTIREBUILDING: NO HEAT/HOT WTR Emergency Resolved
January 13, 2019 4D BUILDING-WIDE ENTIREBUILDING: NO HEAT/HOT WTR Emergency Resolved
January 13, 2019 4D KITCHEN ELEC/GAS-RANGE: NO GAS/ELECTRIC Non-Emergency Resolved
January 13, 2019 2L ENTIRE APT ENTIREBUILDING: NO HEAT/HOT WTR Emergency Resolved
January 13, 2019 2L ENTIRE APT GAS: SHUT- OFF Emergency Resolved
January 06, 2019 7A ENTIRE APT ENTIREBUILDING: NO HEAT Emergency Resolved
December 30, 2018 3R ENTIRE APT ENTIREBUILDING: NO HEAT Emergency Resolved
December 28, 2018 7K ENTIRE APT ENTIREBUILDING: NO HEAT Emergency Resolved
December 16, 2018 2L ENTIRE APT ENTIREBUILDING: NO HEAT Emergency Resolved
November 13, 2018 4L ENTIRE APT ENTIREBUILDING: NO HEAT/HOT WTR Emergency Resolved
July 23, 2018 2K KITCHEN BASIN/SINK: BASIN BKN OR DE Emergency Resolved
July 23, 2018 2K KITCHEN BASIN/SINK: BASIN BKN OR DE Emergency Resolved
April 15, 2018 7C ENTIRE APT ENTIREBUILDING: NO HEAT Emergency Resolved
March 21, 2018 BLDG BUILDING-WIDE ENTIREBUILDING: NO HEAT Emergency Resolved
March 20, 2018 BLDG BUILDING-WIDE ENTIREBUILDING: NO HEAT Emergency Resolved
March 07, 2018 7C ENTIRE APT ENTIREBUILDING: NO HEAT Emergency Resolved
February 04, 2018 5M ENTIRE APT APARTMENTONLY: NO HEAT Emergency Resolved
January 08, 2018 BLDG BUILDING-WIDE ENTIREBUILDING: NO HEAT/HOT WTR Emergency Resolved
January 08, 2018 BLDG BUILDING-WIDE ENTIREBUILDING: NO HEAT/HOT WTR Emergency Resolved
January 08, 2018 BLDG BUILDING-WIDE ENTIREBUILDING: NO HEAT/HOT WTR Emergency Resolved
January 08, 2018 BLDG BUILDING-WIDE ENTIREBUILDING: NO HEAT/HOT WTR Emergency Resolved
January 08, 2018 5N ENTIRE APT WATER-SUPPLY: NO WATER Emergency Resolved
January 08, 2018 5N BUILDING-WIDE WATER-SUPPLY: NO WATER Immediate Emergency Open
January 08, 2018 5N ENTIRE APT WATER-SUPPLY: NO WATER Emergency Resolved
January 08, 2018 5N BUILDING-WIDE WATER-SUPPLY: NO WATER Immediate Emergency Resolved
January 08, 2018 7D ENTIRE APT WATER-SUPPLY: NO WATER Emergency Resolved
January 08, 2018 5N ENTIRE APT APARTMENTONLY: NO HOT WATER Emergency Resolved
August 23, 2017 7B ENTIRE APT ENTIREBUILDING: NO HOT WATER Emergency Resolved
July 18, 2017 4J LIVING ROOM MOLD: N/A Emergency Resolved
July 18, 2017 4J PRIVATE HALL WALLS: PEELING Non-Emergency Resolved
July 18, 2017 4J LIVING ROOM WALLS: PEELING Non-Emergency Resolved
July 18, 2017 4J KITCHEN ELEC/GAS-RANGE: KNOBS MISS/BROK Non-Emergency Resolved
July 18, 2017 4J ENTIRE APT WALLS: PAINT DIRTY Non-Emergency Resolved
March 15, 2017 7O ENTIRE APT APARTMENTONLY: NO HEAT Emergency Resolved
March 11, 2017 5A ENTIRE APT APARTMENTONLY: NO HEAT Emergency Resolved
February 05, 2017 2G ENTIRE APT ENTIREBUILDING: NO HEAT Emergency Resolved
February 03, 2017 5M ENTIRE APT APARTMENTONLY: NO HEAT Emergency Resolved
January 06, 2017 7A ENTIRE APT ENTIREBUILDING: NO HEAT/HOT WTR Emergency Resolved
December 17, 2016 4T ENTIRE APT APARTMENTONLY: NO HEAT Emergency Resolved
December 17, 2016 BLDG BUILDING-WIDE ENTIREBUILDING: NO HEAT Emergency Resolved
December 17, 2016 BLDG BUILDING-WIDE ENTIREBUILDING: NO HEAT Emergency Resolved
December 16, 2016 7C ENTIRE APT APARTMENTONLY: NO HEAT Emergency Resolved
December 11, 2016 BLDG BUILDING-WIDE ENTIREBUILDING: NO HEAT Emergency Resolved
December 11, 2016 BLDG BUILDING-WIDE ENTIREBUILDING: NO HEAT Emergency Resolved
December 11, 2016 1V ENTIRE APT ENTIREBUILDING: NO HEAT Emergency Resolved
October 27, 2016 1V ENTIRE APT ENTIREBUILDING: NO HEAT Emergency Resolved
September 16, 2016 1A ENTIRE APT ENTIREBUILDING: NO HOT WATER Emergency Resolved
February 12, 2016 BLDG BUILDING-WIDE ENTIREBUILDING: NO HEAT/HOT WTR Emergency Resolved
February 12, 2016 6C ENTIRE APT ENTIREBUILDING: NO HEAT/HOT WTR Emergency Resolved
January 22, 2016 BLDG BUILDING-WIDE ENTIREBUILDING: NO HEAT Emergency Resolved
January 19, 2016 7F ENTIRE APT APARTMENTONLY: NO HEAT Emergency Resolved
April 07, 2015 1J ENTIRE APT ENTIREBUILDING: NO HEAT Emergency Resolved
March 20, 2015 4T BATHROOM SLOWLEAK: AT WALL/CEIL Non-Emergency Resolved
January 07, 2015 7F ENTIRE APT APARTMENTONLY: NO HEAT Emergency Resolved
July 13, 2014 2E ENTIRE APT APARTMENTONLY: NO HOT WATER Emergency Resolved
July 01, 2014 4N BLDG ENTRANCE BLL/BZZR/INTRCM: BRKN OR MISSING Non-Emergency Resolved
January 02, 2014 7N ENTIRE APT RADIATOR: CRACKED/MISSING Emergency Resolved
November 27, 2013 5P LIVING ROOM CEILING: CRACKED Non-Emergency Open
November 27, 2013 5P BEDROOM CEILING: CRACKED Non-Emergency Open
November 27, 2013 5P BATHROOM CEILING: CRACKED Non-Emergency Open
September 18, 2013 2U ENTIRE APT VERMIN: MICE Non-Emergency Resolved
September 18, 2013 2U ENTIRE APT VERMIN: OTHER Non-Emergency Resolved
The total number of historical violations for is
28
Violations
Date Observed Violation Priority Status
December 19, 2016 Door Problems Hazardous Closed
§ 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS ... IN THE ENTRANCE LOCATED AT APT 7C, 3rd STORY
July 16, 2014 Rust Problems Non Hazardous Closed
§ 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT AT FRONT OF THE BUILDING ALL STORIES AT FIRE ESCAPE
July 16, 2014 Rust Problems Non Hazardous Closed
§ 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT AT REAR OF THE BUILDING ALL STORIES AT FIRE ESCAPE
April 06, 2014 Mold Hazards Hazardous Closed
§ 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT CEILING 2 SQ.F. NORTH WALL 2 SQ.F. SOUTH WALL 4 SQ.F. AND WEST WALL 1 SQ.F. IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 4T, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
April 06, 2014 Plaster / Paint Problems Hazardous Closed
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILING IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 4T, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
April 06, 2014 Water Leaks Hazardous Closed
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WEST WALL IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 4T, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
April 06, 2014 Plaster / Paint Problems Non Hazardous Closed
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 4T, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
March 19, 2014 Plaster / Paint Problems Non Hazardous Closed
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WEST WALL IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 4T, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
March 19, 2014 Mold Hazards Non Hazardous Closed
§ 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... WEST WALL(APPRX. 1 SQ. FT.) IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 4T, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
December 28, 2013 Paint Problems Non Hazardous Closed
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS IN THE FOYER LOCATED AT APT 5P, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
October 16, 2013 Mouse Infestations Hazardous Closed
§ 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF MICE IN THE KITCHEN LOCATED AT APT 2U, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
September 21, 2013 Mouse Infestations Hazardous Closed
§ 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF MICE LOCATED AT APT 2U, 1st STORY, 4th APARTMENT FROM EAST AT SOUTH
September 21, 2013 Vermin Infestations Hazardous Closed
§ 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN WATER BUGS LOCATED AT APT 2U, 1st STORY, 4th APARTMENT FROM EAST AT SOUTH
November 12, 2011 Plaster / Paint Problems Hazardous Closed
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR SOUTH WALL IN THE 2nd BATHROOM FROM EAST AT SOUTH LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
November 12, 2011 Plaster / Paint Problems Hazardous Closed
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND EAST WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
November 12, 2011 Carbon Monoxide Hazards Hazardous Closed
§ 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). INOPERATIVE LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
June 13, 2011 Plaster / Paint Problems Hazardous Closed
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR SOUTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 7J, 7th STORY, 4th APARTMENT FROM EAST AT SOUTH
June 13, 2011 Plaster / Paint Problems Hazardous Closed
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR SOUTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 7J, 7th STORY, 4th APARTMENT FROM EAST AT SOUTH
September 18, 2010 Health / Safety Hazards Hazardous Closed
§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF DAMPNESS PENETRATING EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 7J, 6th STORY, 4th APARTMENT FROM NORTH AT EAST
September 18, 2010 Plaster / Paint Problems Hazardous Closed
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 7J, 6th STORY, 4th APARTMENT FROM NORTH AT EAST
September 18, 2010 Water Leaks Hazardous Closed
§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK DAMPNESS PENETRATING AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 7J, 6th STORY, 4th APARTMENT FROM NORTH AT EAST
September 18, 2010 Plaster / Paint Problems Hazardous Closed
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 7J, 6th STORY, 4th APARTMENT FROM NORTH AT EAST
September 18, 2010 Smoke Detector Hazards Hazardous Closed
§ 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE LOCATED AT APT 7J, 6th STORY, 4th APARTMENT FROM NORTH AT EAST
September 18, 2010 Carbon Monoxide Hazards Hazardous Closed
§ 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. LOCATED AT APT 7J, 6th STORY, 4th APARTMENT FROM NORTH AT EAST
January 08, 2009 Mold Hazards Hazardous Closed
§ 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT NORTH AND EAST WALLS APPROX. 25 SQ.FT. IN THE 1st ROOM FROM NORTH LOCATED AT APT 2N, 2nd STORY, APARTMENT AT EAST
December 09, 2007 Replacement Parts Needed Hazardous Closed
§ 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE RADIATOR IN THE 1st ROOM FROM EAST LOCATED AT APT 6T, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
November 04, 2004 Carbon Monoxide Hazards Hazardous Closed
§ 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT 3S, 3rd STORY
November 03, 2004 Carbon Monoxide Hazards Hazardous Closed
§ 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT 6A, 6th STORY, APARTMENT AT EAST

Financial

Transportation

Subway Access

No subway entrances within 5 blocks

Taxi Stats

The typical wait time for a taxi is
20
minutes at Benson Avenue and 25th Avenue

Commute Stats

The common time to leave for work in this neighborhood is
8:00 AM to 8:29 AM
The most common way to commute in this neighborhood is
Subway
There are
0
Citi Bike Stations within 3 blocks of
The percent of households with at least one car in this area is
40%

Your Commute Times

New Businesses

EATING - DRINKING
PERSONAL SERVICES
PET SERVICES
SHOPPING
There are
225
NEW
EATING - DRINKING
ESTABLISHMENTs
There are
72
NEW
PERSONAL SERVICES
ESTABLISHMENTs
There are
7
NEW
PET SERVICES
ESTABLISHMENTs
There are
185
NEW
SHOPPING
ESTABLISHMENTs

Local Quality

Local Quality at a Glance

Incident data comes from NYC 311. To report complaints or learn more about NYC 311 visit here
There were
0
noise complaints in the last year within a block
Loud Music / Party
Construction
Loud Talking / Yelling
Car / Truck
Dog Barking
Industrial / Machinery
Alarm
Other
Helicopter

(Map will refresh as you pan. Locations are approximate.)

There were
5
filth complaints in the last year within a block
Sewer
Graffiti
Air Quality
Urinating in Public
Hazardous Materials
Street Filth
Litter / Clutter
Industrial Waste

(Map will refresh as you pan. Locations are approximate.)

There were
2
street complaints in the last year within a block
Street Light
Road Condition
Scaffold Safety
Dead Tree
Sidewalk Condition
Broken Parking Meter

(Map will refresh as you pan. Locations are approximate.)

Rodent Sightings

2 rodent sightings reported within a block of

7 rodent sightings is typical around buildings in Brooklyn

Condition Attracting Rodents
Rat Sighting
Mouse Sighting
Signs of Rodents
Rodent Bite

(Map will refresh as you pan. Locations are approximate.)

Street Trees

312 street trees within a block of

75 street trees is typical around buildings in Brooklyn

School

School District

This property is zoned for
NEW YORK CITY PUBLIC SCHOOLS
This school district has
1,880
schools
There are
1,038,001
students enrolled in this district

Elementary Schools Near

P.S. 101 THE VERRAZANO
0.2 mile away
PS 97 THE HIGHLAWN
0.4 mile away
PS 212 LADY DEBORAH MOODY
0.6 mile away
PS 128 BENSONHURST
0.7 mile away

Middle Schools Near

IS 281 JOSEPH B CAVALLARO
0.2 mile away
KINGSBOROUGH EARLY COLLEGE SCHOOL
0.3 mile away
BROOKLYN STUDIO SECONDARY SCHOOL
0.7 mile away
IS 228 DAVID A BOODY
0.7 mile away

High Schools Near

LIFE ACADEMY HIGH SCHOOL FOR FILM AND MUSIC
0.3 mile away
EXPEDITIONARY LEARNING SCHOOL FOR COMMUNITY LEADER
0.3 mile away
INTERNATIONAL HIGH SCHOOL AT LAFAYETTE
0.3 mile away
KINGSBOROUGH EARLY COLLEGE SCHOOL
0.3 mile away

Construction

There have been
3
construction projects in this building since 2003
Date Type
May 04, 2012 Minor Alteration
INSTALLATION OF TELECOMMUNICATION ON ROOF
October 05, 2010 Minor Alteration
INSTALLATION OF ADDITIONAL TELECOMMUNICATIONS CABINET ON ROOF. INITIAL INSTALLATION APPROVED UNDER APPLICATION #310103580. ALL WORK IN CONFORMANCE WITH TPPN #5/98. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
March 25, 2008 Minor Alteration
INSTALLATION OF TELECOMMUNICATIONS CABINETS, RELATED DUNNAGE, AND RELATED ANTENNAS ON ROOF. ALL WORK IN COMPLIANCE WITH TPPN #5/98. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
There have been
0
scaffolds installed in the last 90 days within 3 blocks
Scaffold
Sidewalk Shed

(Map will refresh as you pan. Locations are approximate.)

There have been
0
demolitions in the last year within 5 blocks
There have been
0
new buildings in the last year within 5 blocks

Demographics

Census at a Glance

The median age is
42
Years Old
The most common education level in this area is
High School Diploma
Households with children are
28%
of all households in this area
The percent of people in this area who are married is
62%

Political

This Building is
77%
registered Democrat

Weather & Natural Disasters